Gudauri Lake

Start time: 2017 Completion time: 2018 Client: United Water Supply Company of Georgia A 100 000 m3 man-made lake has been built in Gudauri. The man-made reservoir will be filled with water from the water supply system of Gudauri Village in summertime when water consumption is minimal and discharge – maximal. In winter water discharge at the headworks goes low but consumption grows. The water collected in the reservoir will make it possible to make artificial snow in the winter season. The project is expected to ensure an effective operation of the artificial snow making system in Gudauri.